Ground broke this week.
The equipment came in Tuesday morning. The footprint of the home is taking shape in the slope.
Afton lots run wide. Bluff sites have setback and slope-stability requirements. Wooded acreage has tree preservation. Village parcels have design review. Heritage has worked the terrain before and designs the home to fit it, not the other way around.
Site walk on your lot with Lori and Dustin to understand the land, the views, and what you’re picturing.
Paid design session locks scope, design intent, and budget framework. The fee credits to the build if you move forward.
Architect-led design over several months, with Heritage coordinating engineering, soils, septic, well, and the bluff and grading work.
Permits, bids, and contract. Long-lead items ordered well before construction starts.
Construction with Friday walks, weekly digests, and an 11-month walk after move-in.
A site walk and preliminary design review tells us. Heritage looks at setbacks, slopes, soils, septic and well, tree preservation, and design constraints.
About twelve to fourteen months from first conversation to move-in. Bluff and wooded sites can take longer because of the engineering and tree-save work.
Yes. Bluff setbacks, septic and well, tree preservation in the wooded sections, design review in the village. Heritage handles all of it as part of pre-construction.
The equipment came in Tuesday morning. The footprint of the home is taking shape in the slope.
Lori reads every inquiry herself.